Nation/World

Nimitz requires more work

WASHINGTON – The Navy said Wednesday it will temporarily shrink its aircraft carrier presence in the Persian Gulf area from two to one because of a mechanical problem with the USS Nimitz, a carrier based in Bremerton.

The Nimitz was scheduled to deploy in January to relieve the USS Dwight D. Eisenhower, but that will be put off until summer in order to complete repairs to its propulsion system. The problem was discovered during pre-deployment maneuvers.

As a result, the Navy made the unusual decision to bring the Eisenhower home to Norfolk, Va., in December and resurface its flight deck so it can go back to the Gulf area in February and remain for four months. That means that in December and January the USS John C. Stennis will be the only carrier in that area, although there are other naval forces there, including Marines aboard a three-ship contingent led by the USS Peleliu.



Click here to comment on this story »



Saving for the future

sponsored According to two 2015 surveys, 62 percent of Americans do not have enough savings to handle an unexpected emergency, much less any long-term plans.



Sections


Profile

Contact the Spokesman

Main switchboard:
(509) 459-5000
Customer service:
(800) 338-8801
Newsroom:
(509) 459-5400
(800) 789-0029
Back to Spokesman Mobile