BAGHDAD – A U.S.-funded water-treatment system for the city of Fallujah will be completed at least three years late, cost more than three times as much as originally planned and serve only a fraction of the city, according to a report by the official monitoring Iraq’s reconstruction.

The $32.5 million project was launched in July 2004 – when insurgents largely controlled the city – and U.S. officials expected it would be completed in January 2006, according to a report set for release today. Now, the main contractor assigned to the project has been let go, costs have ballooned to $98 million and the system, which is expected to be operational in April, will serve 38 percent of the city’s 400,000 residents, inspector general Stuart Bowen concluded.

The Fallujah water-treatment system is the only U.S.-funded project of its kind. American officials made it a priority because they wanted to show their commitment to rebuilding a predominantly Sunni city that was nearly obliterated in 2004 during fierce combat.

The inspector general’s office launched a probe this summer after U.S. Ambassador Ryan Crocker expressed concern over the delays and cost overruns.

The multibillion-dollar U.S. effort to rebuild Iraq’s ailing infrastructure has been stymied by violence, bureaucratic infighting, poor performance by contractors and disagreements between American and Iraqi officials.

Thank you for visiting Spokesman.com. To continue reading this story and enjoying our local journalism please subscribe or log in.

You have reached your article limit for this month.

Subscribe now and enjoy unlimited digital access to Spokesman.com

Unlimited Digital Access

Stay connected to Spokane for as little as 99¢!

Subscribe for access

Already a Spokesman-Review subscriber? Activate or Log in

You have reached your article limit for this month.

Subscribe now and enjoy unlimited digital access to Spokesman.com

Unlimited Digital Access

Stay connected to Spokane for as little as 99¢!

Subscribe for access

Already a Spokesman-Review subscriber? Activate or Log in

Oops, it appears there has been a technical problem. To access this content as intended, please try reloading the page or returning at a later time. Already a Spokesman-Review subscriber? Activate or Log in