Proposed Hagadone Casco Bay Expansion Deadline Today
I don’t know if you are aware of the big request Hagadone has for a rather extensive, perhaps massive enlargement, would be a better description of the dock permit requests for his Casco Bay property. He wants to move the existing dock and boat slips next to Murphy and put in a new bigger and better dock system on the north side.( install a commercial dock with a 30’x3’ ramp, 200’x10’ approach, and 38’x36’ 2 slip dock with 8 pilings) This would allow space for 2 tour boats to tie up there + 2 boat slips, covered I imagine. A 2nd application would convert the existing 12x30 swimming dock/heliport to a new 30x35’ + 4 pilings for a new swimming dock/heliport. A public hearing is scheduled for Dec 13th, 6 pm at the Dept of Lands office, 3780 Industrial Ave South, CdA, 83815. Deadline for written comments is 6pm Wed 12/13. Speakers must sign in by 6pm as well/ A Berry Picker .
Question: For some reason, this one seems to have slipped beneath the radar. Why?
A Berry Picker
* This story was originally published as a post from the blog "Huckleberries Online." Read all stories from this blog