Final 2 Megaloads Leave Tonight
The final two over-legal loads of oil field equipment at the Port of Lewiston in Idaho are scheduled to hit the road Tuesday night, weather permitting. Imperial Oil spokesman Pius Rolheiser says the company moved three loads on Sunday night and plan to move two more on Tuesday. The loads will travel from Lewiston north to Coeur d’Alene on Highway 95. They will travel to and through western Montana on Interstate 90 and Interstate 15 and into Canada for an oil sands project. Both shipments are 24 feet wide and 15 feet high/ AP via Eye On Boise . More here.
Question: In the end was it much ado about nothing re: northern route?
* This story was originally published as a post from the blog "Huckleberries Online." Read all stories from this blog