Top Comment Today — JBelle
JBelle
(RE:
Final tab on McEuen: $20.2M
): I went to the park yesterday, again, and remain sadly disappointed. I think the design by
committee diluted the entire project. The parking garage is an eyesore; the boats create great confusion; and in the end, everybody got a little bit of what they want which all adds up to just about nothing. So I think the one line item where Coeur d’Alene got hosed is Professional Services; the design is just flat awful. And apparently, the engineering needs a nip and tuck to get the water out of “the basement”?
* This story was originally published as a post from the blog "Huckleberries Online." Read all stories from this blog